Aging and People with Disabilities
Safety, Oversight and Quality
Print Inspection: YIZ9
Provider Information
390 NW 2ND AVE
Canby, OR 97013
- Provider ID
- 50R283
- Administrator
- STACY ZIMMERMAN
- Phone
- (503) 266-3031
- ed@countrysidelivingcanby.com
Inspection Details
- Date
- 11/9/2022
- Event ID
- YIZ9
- Inspection type(s)
- Complaint Investig.
- Deficiencies cited
- 2
Citation Details
C0010: Licensing Complaint Investigation
- Visit Number
- 1
- Visit Date
- 11/9/2022
- Corrected Date
- N/A
- Details
-
Assisted Living and Residential Care Facilities must operate and provide services in compliance with all applicable State and local laws, regulations and codes. This report reflects the findings of the complaint investigation conducted 11/09/2022. The facility was evaluated for compliance with Oregon Administrative Rule 411, Division 54 and if applicable, Oregon Administrative Rule 411, Division 57. The following deficiencies were identified:
Abbreviations possibly used in this document:
ADL:activities of daily living
bid:twice a day
CBG:capillary blood glucose or
blood sugar
cc:cubic centimeter
CG:caregiver
cm:centimeter
F:Fahrenheit
HH:Home Health
HS or hs:hour of sleep
LPN:Licensed Practical Nurse
MA:Medication Aide
MAR:Medication Administration
Record
MCCMemory Care Community
mg:milligram
ml:milliliter
O2 sats:oxygen saturation in the
blood
OT:Occupational Therapist
PT: Physical Therapist
PRN:as needed
qd:every day or daily
qid:four times a day
RN:Registered Nurse
SP:service plan
TAR:Treatment Administration
Record
tid:three times a day
C0513: Doors, Walls, Elevators, Odors
- Visit Number
- 1
- Visit Date
- 11/9/2022
- Corrected Date
- N/A
- Details
-
Based on interview, record review and observation, it was confirmed the facility failed to keep in good repair all equipment necessary for the health, safety and comfort of residents. Findings include:
During an unannounced site visit on 11/09/2022, Staff # 1 (S1) stated the boiler was broken and not working, but is now completely repaired. Staff #7 (S7) stated the boiler was shutting off throughout the day, but after a re-set, worked for a few hours. Staff #2 (S2) stated a repair company was called on 10/27/2022 the day the boiler was showing signs of failure.
A review of a work order dated 10/27/2022 described parts being ordered on 10/28/2022 and labor being done to install parts to the boiler on 11/03/2022.
On 11/01/2022, Compliance Specialist (CS) observed the boiler which included the items listed in the work order including blower motor kit and ignition electrodes newly installed. CS tested the water temperature in the kitchen and two bathrooms. Hot water was found in all three areas that were tested. The temperature gauge on the boiler reflected a temperature of 132 degrees Fahrenheit.
Facility Plan of Correction: The facility called a repair service upon discovery of the failed boiler. The repair company had to order parts from and wait for delivery. In the meantime the facility ensured that all residents still had access to hot showers and hot water by bringing residents across the street to the other building. The kitchen was not affected by the boiler being out of commission.